heyo! it’s waishnav
(founder of wyom labs, the studio behind gitcms)
at wyom labs we build our own products, and every one of them has a marketing site in the same repo as the app. it’s the right call: one stack, one deploy, and an agent can ship a new landing page before lunch.
the old advice was to move marketing onto webflow or a wordpress install so engineers stop getting tickets. that made sense when code was slow. now it just means a second website, a second stack and a design that drifts. drag-and-drop is a detour, not a shortcut.
the real problem was never the code. it’s that every copy change still needed an engineer, and now agents can rewrite twenty pages before anyone has read them. cheap changes, no review.
gitcms is how we run our own sites: marketing edits visually, agents draft through the same flow, and every change, from a person or an agent, can be reviewed before it ships. the website stays code. it just stops being an engineering queue.